Used

☆(183023) 2000 expression dyna RZU300 air conditioner condenser 88460-37460

1 / 0

NOTE

  • Import duties, taxes and handling fees are not included in the price and must be paid by customers.
  • Some air shipping carriers may charge an additional fee.
  • The picture shown above may differ from the actual product. For the actual specifications, please contact us.

Used

☆(183023) 2000 expression dyna RZU300 air conditioner condenser 88460-37460

Price $559

BF Point Earn 3 points ($3) on your FIRST PURCHASE
37people are Looking this item right now
Item Location JAPAN
Ref No. PA28163586
Payment MethodsPayment BANK TRANSFER PayPal VISA Mastercard

Items $559

Shipping $160

Total Price $719

to USA via Air Freight (change)
Shipping fee varies depending on items in your cart. You can change options later in the cart.

Quantity : 1
Last One

Inquiry for this item

Specifications

Condition Used
Make TOYOTA
Model -
Product Name ☆(183023) 2000 expression dyna RZU300 air conditioner condenser 88460-37460
Model Code -
Reg. Year/month -
Mileage -
Mission Type -
Engine Model -
Engine Size -
Fuel -
Drive -
Auto Parts Maker -
Genuine Parts No. -

Description











The body information
Car name Dyna Age type August, 2000
Model GE-RZU300-PQMMK3 The body   RZU300-0001191
Designated classification  -  Grade  
Shape 4CT Engine 3RZFE
Engine division Gasoline Displacement volume 2700
Transmission 5FMT Drive type 4 X 2
Kolor No. 058 Body kolor WHITE → Dirt
Trim No. FD15 The mileage (1,000km) 3
Item Name Air conditioner condenser Reference Genuine Item Number 88460-37460
Feeling Report R134  , With fan and motor (11 pieces of feathers)
jo State There is a mesh part number dent, OK that there are no other problems in








+++ +++ that thank you for you seeing it
Please read before a bid by all means.
[about the   of the large product]  

            (Engine, Transmission, scarf, axle, bumper, fender, door)

            When the destination is addressed to personal name,   (3,240 separately additional other than the   price and the  

            It takes it) more than  .

            When the destination is (company, mender, private practice shop) to corporation, is the additional   kakari?

            rimasen. Or   (I cannot use the collect on delivery) of each nearest Seino Transportation business shop stopper

            The additional   does not cost the case of this, too.

[about the last amount of money]

            It is   price + consumption tax +   [cf. list of  ].

[about after  ] 

            Please wait for the receipt of money, the settlement by all means until there is the guidance (email) of the last amount of money from us.

            The bottom that notes that there may not be stock on account of the merchandise management for our motor parts dealer

            sai.

            After the  , I would like the notification from   by all means.

    ※When there is not notification from   or, after the auction  , it is paid the product price within seven days
    But, it is a bid bottom after understanding in what I handle as "cancellation by successful bidder convenience" when there is not it
    sai. When I handle "cancellation by successful bidder convenience", a customer gains "a bad evaluation" automatically.

[about a deadline] 

            A case to always keep   in mind, but to need the days depending on the area of the address is a mat

            I am. In the case of dispatch, please refer beforehand.

[about a product] 

            The product becomes only the thing in the image.

            The product is  .

            About non-test article, I list it in the detailed columns of the product.

[about exchange work] 

            The work needs specialized knowledge, skill.

            Please work on exchange by all means in a car dealer, the certification factory.       

[about  ]

            From shipping date one week.

            When malfunction by the   is recognized, returned goods or a substitute product to our stock

            In some cases, I cope with a substitute product.

            ※Please note that you cannot guarantee it about a wage, expendable supplies, the loaner expense.  

            ※Please confirm the state of the product as soon as you arrived. It is a product by opening after the progress in the days

            When malfunction, damage is confirmed of this, it may not be accepted  .
            

[about the     outside]

            ・A fire, submergence, trouble due to thunderbolts and the damage

            ・Use in the severe situation such as remodeling, the race

            ・When I export it to the foreign countries

            ・The trouble by procedure mistakes on the installation and the damage

            ・When I do not take the confirmation of the conformity beforehand

[inquiry e-mail address]  


[business method] Our company makes a deal in the  .

The   which there is to an automatic delivery email after the   or the product screen which had you make a bid for it 1 and the LIN-KU(輪怐) which was written

You have a   input screen be faster from this, and please fill in the requirements in   by all means.

2, please push the Confirm button after the entry.

If it is to a confirmation screen afterwards, 3, please push the transmission button.

If a decision email reaches it 4, it is entry completion to  .

5 sends a confirmation email from us.

 
[regular holiday]  Sundays and holidays, second Saturday (for the end of the year, the beginning of the year, a tray, the Golden Week with a calendar a confirmation bottom

sai.)

[ ] The inquiry of from 9:00 a.m. to 5:00 p.m. is coped.

(the answer of the inquiry after 5:00 p.m. is next business day.)

Inquiry e-mail address  




  

NOTE